| Last Dates of Regular Examination Form |
| NOTICE SCHEDULE OF FORMS DEPOSIT FOR EXAM HELD IN MAY/JUNE-2009. Date Day Sem. Branch Time 16.03.2009 Monday 2nd CE, ME, EE, PE 11:00am - 1:00pm & 2:30pm - 3:30pm 17.03.2009 Tuesday 2nd ECE, CSE, IT 11:00am - 1:00pm & 2:30pm - 3:30pm 18.03.2009 Wednesday 4th CE, ME, EE, PE 11:00am - 1:00pm & 2:30pm - 3:30pm 19.03.2009 Thursday 4th ECE, CSE , IT 11:00am - 1:00pm & 2:30pm - 3:30pm 20.03.2009 Friday 6th CE, ME, EE, PE 11:00am - 1:00pm & 2:30pm - 3:30pm 23.03.2009 Monday 6th ECE, CSE , IT 11:00am - 1:00pm & 2:30pm - 3:30pm 24.03.2009 Tuesday 8th CE, ME, EE, PE 11:00am - 1:00pm & 2:30pm - 3:30pm 25.03.2009Wednesday 8th ECE, CSE , IT 11:00am - 1:00pm & 2:30pm - 3:30pm 26.03.2009 Thursday 2nd & 4th MBA 11:00am - 1:00pm & 2:30pm - 3:30pm Note:- 1.Examination fee for Regular/Re-Appear = Rs. 500/- 2.Examination Form will be accepted only on the scheduled date as mentioned above. 3.Student must clear their dues (College & Mess) before the submission of examination form. 4.Students are directed to fill codes on Examination Form from concerned department or College Notice Board. 5.Late Fee will be charged as per University Schedule. |
Wednesday, March 18, 2009
Wednesday, March 11, 2009
RELIGARE INSURANCE BROCKING LTD
| ||
| heartiest congratulations and immense pride on the selection of following students of final year MBA (2007-2009) by: RELIGARE INSURANCE BROCKING LTD. : Akash Suri MBA 754,Talwinder Singh MBA 708,Suvneet MBA 722,Vikramjit Singh MBA 742,Arun Sharma MBA 719,Shweta MBA 756,Sakshi MBA 759,Karandeep Singh MBA 703,Ramandeep Singh MBA 757. | ||
Tuesday, March 10, 2009
Up coming Events
Photography Exhibition cum Workshop 13 and 14-3-09,;
Management Week (SCIE, Computer Club & LUG, Ludhiana) 16 to 20-3-09
:Wall Street 16-3-09,
Be a Manager Contest 17,18 & 20-3-09,
Press Conference 19-3-09,
Documentary 20-3-09,;
Cultural Event as tribute to S. Bhagat Singh Ji 23-3-09,;
Computer related activities(LUG, Ludhiana) 08-4-09.
Management Week (SCIE, Computer Club & LUG, Ludhiana) 16 to 20-3-09
:Wall Street 16-3-09,
Be a Manager Contest 17,18 & 20-3-09,
Press Conference 19-3-09,
Documentary 20-3-09,;
Cultural Event as tribute to S. Bhagat Singh Ji 23-3-09,;
Computer related activities(LUG, Ludhiana) 08-4-09.
HAPPY HOLI TO ALL
May This Holi Come With Full of Happiness Like Colors Of this Festival.
Thursday, March 5, 2009
Students from 3rd Year and Final Year all branches( except Civil) are directed to appear for the PAC test.
PAC TEST
2006-10 and 2006-09 Batch
Students from 3rd Year and Final Year all branches( except Civil) are directed to appear for the PAC test.
Since 2003, PAC and the Bright Sparks Program has helped tens of
thousands of students stand-out from the crowd and get jobs with the
world's best employers.
The entire Bright Sparks Program is totally free of cost for the
students / Campus. This is primarily for the Final & Pre-Final year
students, all branches.
The next session for PAC Global Certification exam of Bright
Sparks Program will be held from 2nd to 5th March, 2009 for GNDEC
Access Information
All Propel profiles and Global Certifications must be completed
between the following dates:
Start Date:2nd March 8:00 AM (IST)
End Date: 5th March 10.00 PM (IST)
Admission Instruction
Please use a modern web browser (IE7 or Firefox) and visit: http://
pacexam.com/reception
Your Invitation Number is: BST456
You will need to complete a brief personal profile before you begin.
You can complete your exam and application online at a location of
your choice. Please be sure to pick a location with reliable internet
access and power.
(Please do not share this invitation with people who were not invited.)
If you have any technical issues or questions, please email us at
talent@proaptitude.com. The Talent Support Team is oncall to assist
you.
Please ensure that you finish the registration process and Practice
Assessments before the Global Certification Exam. You may do the same
by visiting www.pacsparks.com
Organizations like Oracle, L & T Infotech, Tata Elxsi, S A P, Sapient
Corporation etc and many more have expressed their desire to be
corporate members of the Bright Sparks program.
For your reference, we have also attached a letter signed by L & T
Infotech, which will help you understand the kind of work we do with
our corporate members.
Based on our association with Corporate members across the world, we
like to share the belief that Organizations like to look deeper and
consider more number of talents, before they make an offer. This has
also been substantiated by the press and various other media
coverages. Please find attached a scanned copy of an Article from
Deccan Herald, and links to other online articles in CIOL and Times
Ascent.
PAC Bright Sparks Coverage in Cybermedia India OnLine - CIOL 27
January, 2009 ( CyberMedia is the largest specialty media house in
South Asia and amongst India's top five magazine publishers.)
> http://www.ciol.com/News/News-Reports/Sensible-recruitment-in-the-
> time-of-recession/27109115221/0/
PAC Bright Sparks Coverage in Times of India - Ascent 02 February,
2009
http://www.timesascent.in/index.aspx?
page=article§id=21&contentid=2009020120090201184810700e17dc0ef
K S MANN
DEAN T&P
Posted by Training and Placement on 2 March 2009 at 09:49 PM
2006-10 and 2006-09 Batch
Students from 3rd Year and Final Year all branches( except Civil) are directed to appear for the PAC test.
Since 2003, PAC and the Bright Sparks Program has helped tens of
thousands of students stand-out from the crowd and get jobs with the
world's best employers.
The entire Bright Sparks Program is totally free of cost for the
students / Campus. This is primarily for the Final & Pre-Final year
students, all branches.
The next session for PAC Global Certification exam of Bright
Sparks Program will be held from 2nd to 5th March, 2009 for GNDEC
Access Information
All Propel profiles and Global Certifications must be completed
between the following dates:
Start Date:2nd March 8:00 AM (IST)
End Date: 5th March 10.00 PM (IST)
Admission Instruction
Please use a modern web browser (IE7 or Firefox) and visit: http://
pacexam.com/reception
Your Invitation Number is: BST456
You will need to complete a brief personal profile before you begin.
You can complete your exam and application online at a location of
your choice. Please be sure to pick a location with reliable internet
access and power.
(Please do not share this invitation with people who were not invited.)
If you have any technical issues or questions, please email us at
talent@proaptitude.com. The Talent Support Team is oncall to assist
you.
Please ensure that you finish the registration process and Practice
Assessments before the Global Certification Exam. You may do the same
by visiting www.pacsparks.com
Organizations like Oracle, L & T Infotech, Tata Elxsi, S A P, Sapient
Corporation etc and many more have expressed their desire to be
corporate members of the Bright Sparks program.
For your reference, we have also attached a letter signed by L & T
Infotech, which will help you understand the kind of work we do with
our corporate members.
Based on our association with Corporate members across the world, we
like to share the belief that Organizations like to look deeper and
consider more number of talents, before they make an offer. This has
also been substantiated by the press and various other media
coverages. Please find attached a scanned copy of an Article from
Deccan Herald, and links to other online articles in CIOL and Times
Ascent.
PAC Bright Sparks Coverage in Cybermedia India OnLine - CIOL 27
January, 2009 ( CyberMedia is the largest specialty media house in
South Asia and amongst India's top five magazine publishers.)
> http://www.ciol.com/News/News-Reports/Sensible-recruitment-in-the-
> time-of-recession/27109115221/0/
PAC Bright Sparks Coverage in Times of India - Ascent 02 February,
2009
http://www.timesascent.in/index.aspx?
page=article§id=21&contentid=2009020120090201184810700e17dc0ef
K S MANN
DEAN T&P
Posted by Training and Placement on 2 March 2009 at 09:49 PM
Wednesday, February 25, 2009
BEST GOVERNMENT ENGINEERING COLLEGE IN PUNJAB
![]() |
Tuesday, February 24, 2009
Date Sheet 1st Internal Tests M.Tech. Part-Time
| Date Sheet 1st Internal Tests M.Tech. Part-Time |
| The date sheet and syllabus for the 1st internal tests of M.Tech. (CSE) Part-Time 2nd Sem. is as under: 28.02.2009 Advance Software Engineering: Introduction: Life Cycle Models, Requirement Analysis and Specification, Formal Requirements Specification Fundamentals Issues in Software Design: Goodness of designs, Cohesions, Coupling, Function Oriented Design: Structured Analysis and Design, Object Oriented Concepts. 01.03.2009 Network Security: Introduction: Overview of Computer Networks, Seven Layer Architecture, TCP/IP Suite of Protocols, etc. MAC Protocols for high speed LANS, MANS and Wireless LANS (For Example FDDI, DQDB, HIPPI, Gigabit Ethernet, Wireless Ethernet etc) OI/c .M.Tech. (CSE) |
Posted by Officer Incharge(M.Tech-CSE) on 24 February 2009 at 06:20 PM |
Six Month Industrial Training Schedule for 2006 Batch
| Six Month Industrial Training |
| 2006 Batch |
| GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA (Training and Placement Cell) No….PTP/ Date: Six Month Industrial Training Schedule for 2006 Batch 1. B.Tech Electrical Engg. Semester 7th 2. B.Tech Production Engg. Semester 7th 3. B.Tech Civil Engg. Semester 8th 4. B.Tech Computer Sci & Engg. Semester 7th 5. B.Tech Electronics & Communication Engg. Semester 8th 6. B.Tech Information Technology Semester 8th 7. B.Tech Mechanical Engg. Semester 8th 7th Semester 1st July to 31st December 2009 8th Semester 1st Jan to 15th June 2010 KS Mann Dean (T&P) |
Posted by Training and Placement on 23 February 2009 at 04:37 PM |
Saturday, February 21, 2009
training checking is scheduled
First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her.
insurance policy from ICICI
The Institute has got an insurance policy from ICICI Lombard General Insurance Company Limited for the accidental coverage of its students. The salient features of the policy can be downloaded by clicking the downnload button.
Friday, February 20, 2009
BEST COLLEGE
GNDEC BEST GOVERNMENT ENGINEERING COLLEGE IN PUNJAB It is a matter of great pride that our college has been ranked the best Government Engineering College in Punjab (Source: outlookindia.com). The survey of all the Engineering Institutes of the country including IIT's, NIT's and Central institutes was done on criterion like infrastructure, intellectual capital, industry interface, placement performance and pedagogic systems. In the above survey, the College was ranked amongst the top twenty institutes in India in terms of infrastructure and pedagogic systems and performed creditably on other parameters and ranked 31st in the country.
Tuesday, February 17, 2009
IT/CIVIL/ECE and Mech 2005-09
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
Monday, February 16, 2009
Thesis Collection
| LIB/c/1 |
| Thesis Collection |
| Dear Readers You can check all the M.E.Thesis's details along with abstract, available in the Central Library,GNDEC at the following url : http://192.168.8.249/opac/welcome.asp You can also check the current articles from our subscribed Journals & List of Journals available in our own Library etc. from the above said link. you can also browse this link & some other useful links from the Librarian's blog i.e. http://kanwaldhindsa.blogspot.com/ Pls. Check "Web Links" & then "GNE OPAC" for above said search Librarian |
Posted by Library on 16 February 2009 at 05:34 PM |
NCERT Doctoral Fellowship
| lib/f/1 |
| NCERT Doctoral Fellowship |
| Applications are Invited for the award of 10 NCERT Doctoral Fellowship in the field of Education. Please check the following URL for more details: www.ncert.nic.in or read the Employment News Page No.20 fr 7-13 Feb.,2009 Librarian |
Posted by Library on 16 February 2009 at 05:25 PM |
Sunday, February 15, 2009
Six Month Industrial Training
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
Six Month Industrial Training
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
N R SWITCHES & RADIO SERVICES
| N R SWITCHES & RADIO SERVICES |
| JOINT CAMPUS PLACEMENT |
| N R SWITCHES & RADIO SERVICES is coming for joint campus placement on Feb.17th, 2009 for 2008 and 2009 passout students of Electronics & Communication Engineering at 08:30AM sharp in Consultancy Hall of college campus. All the Eligible students must bring their Original Certificates, resumes, College ID cards along with two passport size photographs. Eligibility Criteria : 1. 50% and above in B. Tech. 2. Only Male Students are eligible K.S. Mann Dean (T & P) |
Posted by Training and Placement on 11 February 2009 at 02:48 PM |
SIX MONTH INDUSTRIAL TRAINING
| SIX MONTH INDUSTRIAL TRAINING |
| 2005-09 IT ,Mech,ECE and Civil |
| Following studetns did not submit any confirmation regarding their training:- IT 5622 5656 5686 Mechanical Civil 5016 5017 5034 5036 5067 5068 ECE 5301 5305 5308 5312 5313 5326 5334 5336 5337 5376 5377 Note: These students are directed to confirm their location of training immediately, ohterwise their training stand cancel w.e.f from Monday 9.2.2009. KS MANN DEAN T&P |
Posted by Training and Placement on 6 February 2009 at 03:27 PM |
Six Month Industrial Training
| Six Month Industrial Training |
| 2006 Batch |
| GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA (Training and Placement Cell) No….PTP/ Date: Six Month Industrial Training Schedule for 2006 Batch 1. B.Tech Electrical Engg. Semester 7th 2. B.Tech Production Engg. Semester 7t 3. B.Tech Civil Engg. Semester 8th 4. B.Tech Computer Sci & Engg. Semester 7th 5. B.Tech Electronics & Communication Engg. Semester 8th 6. B.Tech Information Technology Semester 8th 7. B.Tech Mechanical Engg. Semester 8th 7th Semester 1st July to 31st December 2009 8th Semester 1st Jan to 15th June 2010 KS Mann Dean (T&P) |
Posted by Training and Placement on 2 February 2009 at 09:26 PM |
Starting of M.Tech. (CSE) Classes
| Starting of M.Tech. (CSE) Classes |
| URGENT NOTICE The classes of M.Tech. (CSE) Part Time 2nd & 4th semester students will start from 31.1.2009 (saturday) at 9:00 AM. The Time Table is available at departmental notice board. O/Ic M.Tech. (CSE) |
Posted by Officer Incharge(M.Tech-CSE) on 29 January 2009 at 07:31 PM |
Paper Extend
| Paper Extend |
| NOTICE As per the information from the PTU Jalandhar, the examination of 3rd /4th Semester B.Tech in the subject of Math III (AM 201/CS 203/CS204) which was held on 09.01.09 stand cancelled. The same paper will be held on dated 31.01.09 in the evening session 1.30 pm to 4.30 pm. Controller of Examinations |
Posted by Student Section on 27 January 2009 at 09:57 PM |
Subscribe to:
Comments (Atom)
