![]() |
Wednesday, February 25, 2009
BEST GOVERNMENT ENGINEERING COLLEGE IN PUNJAB
Tuesday, February 24, 2009
Date Sheet 1st Internal Tests M.Tech. Part-Time
| Date Sheet 1st Internal Tests M.Tech. Part-Time |
| The date sheet and syllabus for the 1st internal tests of M.Tech. (CSE) Part-Time 2nd Sem. is as under: 28.02.2009 Advance Software Engineering: Introduction: Life Cycle Models, Requirement Analysis and Specification, Formal Requirements Specification Fundamentals Issues in Software Design: Goodness of designs, Cohesions, Coupling, Function Oriented Design: Structured Analysis and Design, Object Oriented Concepts. 01.03.2009 Network Security: Introduction: Overview of Computer Networks, Seven Layer Architecture, TCP/IP Suite of Protocols, etc. MAC Protocols for high speed LANS, MANS and Wireless LANS (For Example FDDI, DQDB, HIPPI, Gigabit Ethernet, Wireless Ethernet etc) OI/c .M.Tech. (CSE) |
Posted by Officer Incharge(M.Tech-CSE) on 24 February 2009 at 06:20 PM |
Six Month Industrial Training Schedule for 2006 Batch
| Six Month Industrial Training |
| 2006 Batch |
| GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA (Training and Placement Cell) No….PTP/ Date: Six Month Industrial Training Schedule for 2006 Batch 1. B.Tech Electrical Engg. Semester 7th 2. B.Tech Production Engg. Semester 7th 3. B.Tech Civil Engg. Semester 8th 4. B.Tech Computer Sci & Engg. Semester 7th 5. B.Tech Electronics & Communication Engg. Semester 8th 6. B.Tech Information Technology Semester 8th 7. B.Tech Mechanical Engg. Semester 8th 7th Semester 1st July to 31st December 2009 8th Semester 1st Jan to 15th June 2010 KS Mann Dean (T&P) |
Posted by Training and Placement on 23 February 2009 at 04:37 PM |
Saturday, February 21, 2009
training checking is scheduled
First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her.
insurance policy from ICICI
The Institute has got an insurance policy from ICICI Lombard General Insurance Company Limited for the accidental coverage of its students. The salient features of the policy can be downloaded by clicking the downnload button.
Friday, February 20, 2009
BEST COLLEGE
GNDEC BEST GOVERNMENT ENGINEERING COLLEGE IN PUNJAB It is a matter of great pride that our college has been ranked the best Government Engineering College in Punjab (Source: outlookindia.com). The survey of all the Engineering Institutes of the country including IIT's, NIT's and Central institutes was done on criterion like infrastructure, intellectual capital, industry interface, placement performance and pedagogic systems. In the above survey, the College was ranked amongst the top twenty institutes in India in terms of infrastructure and pedagogic systems and performed creditably on other parameters and ranked 31st in the country.
Tuesday, February 17, 2009
IT/CIVIL/ECE and Mech 2005-09
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
Monday, February 16, 2009
Thesis Collection
| LIB/c/1 |
| Thesis Collection |
| Dear Readers You can check all the M.E.Thesis's details along with abstract, available in the Central Library,GNDEC at the following url : http://192.168.8.249/opac/welcome.asp You can also check the current articles from our subscribed Journals & List of Journals available in our own Library etc. from the above said link. you can also browse this link & some other useful links from the Librarian's blog i.e. http://kanwaldhindsa.blogspot.com/ Pls. Check "Web Links" & then "GNE OPAC" for above said search Librarian |
Posted by Library on 16 February 2009 at 05:34 PM |
NCERT Doctoral Fellowship
| lib/f/1 |
| NCERT Doctoral Fellowship |
| Applications are Invited for the award of 10 NCERT Doctoral Fellowship in the field of Education. Please check the following URL for more details: www.ncert.nic.in or read the Employment News Page No.20 fr 7-13 Feb.,2009 Librarian |
Posted by Library on 16 February 2009 at 05:25 PM |
Sunday, February 15, 2009
Six Month Industrial Training
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
Six Month Industrial Training
| Six Month Industrial Training |
| IT/CIVIL/ECE and Mech 2005-09 |
| First evaluation of training checking is scheduled within the month of February 2009. Students are directed to get ready their synopsis and daily diaries, as these documents will be checked by the Teachers visiting the various companies during the training checking activity. If any students want to avail leave from company on any day, he/she is directed to intimate his/her faculty T&P Coordinator in the college as well as in the office of T&P, about the leave. Any student found absent during checking , a strict action will be taken against him/her. Note: List of the students alongwith the company name and address is attached online at www.gndec.ac.in/confirmation.xls. The students who did not submit their confirmation, their evaluation of training is not possible and they are directed to visit their Respective HODs. K S MAAN DEAN T&P |
Posted by Training and Placement on 13 February 2009 at 03:35 PM |
N R SWITCHES & RADIO SERVICES
| N R SWITCHES & RADIO SERVICES |
| JOINT CAMPUS PLACEMENT |
| N R SWITCHES & RADIO SERVICES is coming for joint campus placement on Feb.17th, 2009 for 2008 and 2009 passout students of Electronics & Communication Engineering at 08:30AM sharp in Consultancy Hall of college campus. All the Eligible students must bring their Original Certificates, resumes, College ID cards along with two passport size photographs. Eligibility Criteria : 1. 50% and above in B. Tech. 2. Only Male Students are eligible K.S. Mann Dean (T & P) |
Posted by Training and Placement on 11 February 2009 at 02:48 PM |
SIX MONTH INDUSTRIAL TRAINING
| SIX MONTH INDUSTRIAL TRAINING |
| 2005-09 IT ,Mech,ECE and Civil |
| Following studetns did not submit any confirmation regarding their training:- IT 5622 5656 5686 Mechanical Civil 5016 5017 5034 5036 5067 5068 ECE 5301 5305 5308 5312 5313 5326 5334 5336 5337 5376 5377 Note: These students are directed to confirm their location of training immediately, ohterwise their training stand cancel w.e.f from Monday 9.2.2009. KS MANN DEAN T&P |
Posted by Training and Placement on 6 February 2009 at 03:27 PM |
Six Month Industrial Training
| Six Month Industrial Training |
| 2006 Batch |
| GURU NANAK DEV ENGINEERING COLLEGE LUDHIANA (Training and Placement Cell) No….PTP/ Date: Six Month Industrial Training Schedule for 2006 Batch 1. B.Tech Electrical Engg. Semester 7th 2. B.Tech Production Engg. Semester 7t 3. B.Tech Civil Engg. Semester 8th 4. B.Tech Computer Sci & Engg. Semester 7th 5. B.Tech Electronics & Communication Engg. Semester 8th 6. B.Tech Information Technology Semester 8th 7. B.Tech Mechanical Engg. Semester 8th 7th Semester 1st July to 31st December 2009 8th Semester 1st Jan to 15th June 2010 KS Mann Dean (T&P) |
Posted by Training and Placement on 2 February 2009 at 09:26 PM |
Starting of M.Tech. (CSE) Classes
| Starting of M.Tech. (CSE) Classes |
| URGENT NOTICE The classes of M.Tech. (CSE) Part Time 2nd & 4th semester students will start from 31.1.2009 (saturday) at 9:00 AM. The Time Table is available at departmental notice board. O/Ic M.Tech. (CSE) |
Posted by Officer Incharge(M.Tech-CSE) on 29 January 2009 at 07:31 PM |
Paper Extend
| Paper Extend |
| NOTICE As per the information from the PTU Jalandhar, the examination of 3rd /4th Semester B.Tech in the subject of Math III (AM 201/CS 203/CS204) which was held on 09.01.09 stand cancelled. The same paper will be held on dated 31.01.09 in the evening session 1.30 pm to 4.30 pm. Controller of Examinations |
Posted by Student Section on 27 January 2009 at 09:57 PM |
Subscribe to:
Comments (Atom)
